[Sign Up Now] to Receive Our FREE Daily SCVTV-SCVNews Digest by E-Mail

SCVNews.com | Caltrans Construction Schedule, I-5 in Gorman Area | 10-20-2012
Inside
Weather
Santa Clarita CA
Clear
Clear
65°F
 
Calendar
Today in
S.C.V. History
August 17
1920 - Actress Maureen O'Hara born in Ireland; 1961 "Parent Trap" uses Disney Golden Oak Ranch [story]


[Caltrans] – The California Department of Transportation plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports.

 

Click image to enlarge

 

Closure Dates: Monday, October 22, to Saturday, October 27

 

Northbound I-5

* Northbound I-5 between Vista Del Lago Rd. and the Kern County line

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Quail Lake Road on-ramp to northbound I-5

TIME: 8 p.m. to 6 a.m.

* Northbound I-5 off-ramp to Quail Lake Road

TIME: 8 p.m. to 6 a.m.

 

Southbound I-5

* Southbound I-5 between the Kern County line and Vista Del Lago Road.

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Southbound I-5 off-ramp to Smokey Bear Road

TIME: 9 a.m. to 3 p.m. and 8 p.m. to 6 a.m.

 

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

Comment On This Story
COMMENT POLICY: We welcome comments from individuals and businesses. All comments are moderated. Comments are subject to rejection if they are vulgar, combative, or in poor taste.
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.

0 Comments

You can be the first one to leave a comment.

Leave a Comment


SCV NewsBreak
Loading...
Related Content
LOCAL NEWS HEADLINES
Wednesday, Aug 16, 2017
Farmers, Environmentalists Join to Fight California ‘WaterFix’ Project
Farmers and environmentalists are lining up to battle the $16.7 billion California WaterFix tunnels project proposed for the Sacramento-San Joaquin River Delta.
Wednesday, Aug 16, 2017
Wilk Urges Public Safety When Releasing ‘Non-Violent’ Felons
Senator Scott Wilk, R- Antelope Valley, today submitted a letter to the California Department of Corrections and Rehabilitation during a public comment period regarding proposed regulations that could lead to the early release of dangerous "nonviolent" inmates and diminish victim rights.
Wednesday, Aug 16, 2017
SCV Deputies Arrest 3, Seize Drugs, Weapons
Santa Clarita Valley Sheriff's Station deputies arrested three suspects and seized drugs and weapons in a recent burglary suppression operation.
Keep Up With Our Facebook

Latest Additions to SCVNews.com
1920 - Actress Maureen O'Hara born in Ireland; 1961 "Parent Trap" uses Disney Golden Oak Ranch [story]
Farmers and environmentalists are lining up to battle the $16.7 billion California WaterFix tunnels project proposed for the Sacramento-San Joaquin River Delta.
Farmers, Environmentalists Join to Fight California ‘WaterFix’ Project
There's a new Grizzly at Golden Valley High School as Matt Sorensen has been named the school's new head baseball coach.
Matt Sorenson New Head Baseball Coach at Golden Valley
Tonight on SCV NewsBreak, Sheriff’s deputies are continuing to conduct burglary suppression operations in our valley. Plus, Representative Steve Knight sat down with local law enforcement to discuss the current state and future role of policing in the SCV. Watch these stories and more on tonight's edition of SCV NewsBreak.
SCV NewsBreak for Wednesday, August 16, 2017
The Saugus Union School Board is establishing a committee to advise on the development of policies and procedures for the sale or lease of surplus real property owned by the District.
Saugus Board Creates Surplus Property Advisory Committee
The SCV Sanitation Board has provided an update in its efforts to comply with the state-mandated chloride limit, including finalizing the Recirculated EIR released for public comment in May.
SCV Sanitation Board Finalizing EIR Due August 18
"Music, Volume 1," the latest album by platinum recording artist and CalArts' School of Music namesake Herb Alpert, recently reached the No. 1 spot on the Billboard Contemporary Jazz Albums chart.
Herb Alpert’s Latest Album Tops Billboard Jazz Chart
The Castaic Union School District's Governing Board will hold a special meeting on Thursday, August 17 at 5 p.m.
August 17: Castaic Schools Governing Board Special Meeting
MannKind Corp. is moving its corporate headquarters to Westlake Village, after nearly 17 years in Valencia, according to the latest quarterly report it filed with the SEC.
MannKind Corp. Moving from Valencia to Westlake Village
CalArts grads Mark Bradford and Sharon Lockhart headline the Un-Private Collection artist talk at the Orpheum Wednesday night, presented by the Broad museum of contemporary art.
August 16: CalArtians Mark Bradford, Sharon Lockhart at Broad in L.A.
Santa Clarita Valley International School has hired veteran coach Ken Erenberg as athletic director, the school announced today.
Ken Erenberg Named SCVi Athletic Director
The Los Angeles Dodgers took the first of the two-game Interleague series with a 6-1 victory over the White Sox at Dodger Stadium Tuesday night.
Dodgers Soil White Sox 6-1 Tuesday
40 oz. to Freedom arrives in Santa Clarita as part of its anniversary tour at Concerts in the Park at Central Park on Saturday, August 19, with showtime at 7 p.m.
August 19: 40 Oz. to Freedom Rocks Central Park
Senator Scott Wilk, R- Antelope Valley, today submitted a letter to the California Department of Corrections and Rehabilitation during a public comment period regarding proposed regulations that could lead to the early release of dangerous "nonviolent" inmates and diminish victim rights.
Wilk Urges Public Safety When Releasing ‘Non-Violent’ Felons
The Los Angeles County Commission on Human Relations released a statement Wednesday morning, condemning the violence and mourning a death in Charlottesville.
County Commission Mourns Death of Charlottesville Protester
Garrett Hampson, the Cal League’s reigning Player of the Week, slugged a two-run home run to lead the Lancaster JetHawks to a 5-3 win over the San Jose Giants on Tuesday night at Municipal Stadium.
Hampson Stays Hot, Lifts ‘Hawks Over Giants
Santa Clarita Valley Sheriff's Station deputies arrested three suspects and seized drugs and weapons in a recent burglary suppression operation.
SCV Deputies Arrest 3, Seize Drugs, Weapons
1947 - Newhall Hardware opens on Spruce Street, now called Main Street [story]
Representative Steve Knight, R-Palmdale, sat down with Santa Clarita law enforcement officials to discuss the current state and future role of policing in the SCV.
Knight, Law Enforcement Officials Hold Roundtable Discussion
From the Facebook page of Shirley Miller, public information officer, social media manager at Santa Clarita Valley Sheriff's Station: LASD Carjacker Captured (with some help).
Community Member Tackles Suspected Carjacker
A funeral service for William Clinton Cloyd Sr., a renowned architect and home builder in the Santa Clarita Valley, is being held Wednesday, August 16 in Eternal Valley’s Upper Chapel.
Funeral Services Wednesday for SCV Homebuilder, Architect William Cloyd Sr.
Tonight on SCV NewsBreak, deputies are looking for a hit-and-run suspect. Plus, county supervisors have approved a motion to a establish a Blue Ribbon Commission on public safety.. Watch these stories and more on tonight's edition of SCV NewsBreak.
SCV NewsBreak for Tuesday, August 15, 2017
To kick-start its celebration of the 10th Anniversary of the revival of TMU Theatre Arts, the school is bringing back a favorite.
TMU Celebrates 10th Anniversary Revival of Theater Arts
College of the Canyons is hosting 2017 Professional Development Week — a week of seminars, lectures, and workshops concerning student development and teaching.
COC Professional Development Week Underway
In the fall, College of the Canyons will offer several Associate Degrees for Transfer (AD-T) at the Canyon Country campus, including Business Administration, Psychology, and Sociology.
COC Will Now Offer “Degrees With a Guarantee”
On a motion by Supervisors Kathryn Barger and Janice Hahn, the Board of Supervisors voted 3-0, with Supervisor Mark Ridley-Thomas abstaining, to establish a “Blue Ribbon Commission on Public Safety” to explore innovative solutions to criminal justice challenges resulting from statewide reform
Supes Approve Blue Ribbon Commission on Public Safety
If left uncontrolled, diabetes can lead to some really bad outcomes, including kidney problems, glaucoma and other eye disorders, foot ulcers, amputation of feet or legs, stroke, diabetic coma, and even death.
Medicare and Your Diabetes | Commentary by Greg Dill
In recent weeks, the Greater Los Angeles County Vector Control District (GLACVCD) has seen a marked increase in West Nile virus (WNV) activity across its jurisdiction.
County Seeing Increase in West Nile Virus Activity
Arroyo Seco Junior High School will be celebrating its 50th Anniversary on Friday, September 1, with a midday ceremony and festivities.
Sept. 1: Arroyo Seco Junior High Celebrates 50th Anniversary
A veteran investigator of sex crimes in Santa Clarita discussed concerns created by coverage and social media, as part an ongoing KHTS News series.
Social Media Poses New Concerns for Sex Crimes Investigations
On Friday, August 18th, 2017, the California Highway Patrol Newhall Area Office will be conducting a sobriety checkpoint in the unincorporated area of Los Angeles County.
DUI Checkpoint Scheduled for Friday
Communication With All Life University and founder Joan Ranquet to present upcoming workshops in learning animal communication, energy healing techniques for animals, and death & the art of dying.
Oct. 6-15: Animal Communication Workshops
Join the VIA Education Foundation and the Valley Industry Association in mentoring today's high school students to prepare them for their future.
VIA School Program Looking for Facilitators to Mentor Students
The city of Santa Clarita will host the 23rd Annual River Rally Cleanup and Environmental Expo on Saturday, September 23, 2017 from 8:00 a.m. to 11:00 a.m.
Sept. 22-23: Registration Deadline, Annual River Rally Cleanup
In an effort to make its art holdings more accessible to the public, The Broad, a contemporary art museum in Downtown Los Angeles, created The Un-Private Collection, an ongoing series of conversations with artists whose work is part of The Broad collection.
Aug. 16: CalARTS Alum Featured Artist at The Broad