header image

[Sign Up Now] to Receive Our FREE Daily SCVTV-SCVNews Digest by E-Mail

Inside
Weather


 
Calendar
Today in
S.C.V. History
April 19
1880 - Pico Oil Spring Mine Section 2 patented by R.F. Baker and Edward F. Beale [story]
E.F. Beale


[Caltrans] – The California Department of Transportation plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports.

Closure Dates: Monday, October 29, to Saturday, November 3

 

Northbound I-5

* Northbound I-5 between Vista Del Lago Rd. and the Kern County line

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Quail Lake Road on-ramp to northbound I-5

TIME: 8 p.m. to 6 a.m.

* Northbound I-5 off-ramp to Quail Lake Road

TIME: 8 p.m. to 6 a.m.

 

Southbound I-5

* Southbound I-5 between the Kern County line and Vista Del Lago Rd.

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

 

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

Comment On This Story
COMMENT POLICY: We welcome comments from individuals and businesses. All comments are moderated. Comments are subject to rejection if they are vulgar, combative, or in poor taste.
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.

0 Comments

You can be the first one to leave a comment.

Leave a Comment


SCV NewsBreak
LOCAL NEWS HEADLINES
Thursday, Apr 18, 2024
June 1: Rare Warrior 24 Race Benefiting Project Sebastian
Join local nonprofit Project Sebastian for an exhilarating day of racing and community support at its Rare Warrior 24 race on Saturday, June 1, at Heritage Park in the heart of Santa Clarita.
Thursday, Apr 18, 2024
April 27: Drug Take Back Day at SCV Sheriff’s Station
Santa Clarita Valley Sheriff's Station Station deputies will be taking part in the “DEA National Drug Take Back Day,” Saturday, April 27, from 10 a.m. to 2 p.m., in front of the SCV Sheriff’s Station, located at 26201 Golden Valley Road.
Thursday, Apr 18, 2024
April 30: COC Hosts Nonprofit Community Resource Fair
The College of the Canyons Center for Civic and Community Engagement—in collaboration with COC’s Golden Z Club—invites the community to attend the Nonprofit Community Resource Fair on Tuesday, April 30.
Keep Up With Our Facebook

Latest Additions to SCVNews.com
1880 - Pico Oil Spring Mine Section 2 patented by R.F. Baker and Edward F. Beale [story]
E.F. Beale
The Master's University men's golf team shot a 13-under 275 to finish second at the Golden State Athletic Conference Men's Golf Championships held at Briarwood Country Club in Sun City West, Ariz.
TMU Men’s Golf Places 2nd, Women 5th at GSAC Championships
Join local nonprofit Project Sebastian for an exhilarating day of racing and community support at its Rare Warrior 24 race on Saturday, June 1, at Heritage Park in the heart of Santa Clarita.
June 1: Rare Warrior 24 Race Benefiting Project Sebastian
Santa Clarita Valley Sheriff's Station Station deputies will be taking part in the “DEA National Drug Take Back Day,” Saturday, April 27, from 10 a.m. to 2 p.m., in front of the SCV Sheriff’s Station, located at 26201 Golden Valley Road.
April 27: Drug Take Back Day at SCV Sheriff’s Station
The College of the Canyons Center for Civic and Community Engagement—in collaboration with COC’s Golden Z Club—invites the community to attend the Nonprofit Community Resource Fair on Tuesday, April 30.
April 30: COC Hosts Nonprofit Community Resource Fair
College of the Canyons made quick work of visiting L.A. Valley College in a shortened 11-3 home victory that came on a day in which the program unveiled its newly named Michele Jenkins Softball Team Room during a pre-game dedication ceremony.
Lady Cougs Outslug L.A. Valley 11-3
For aspiring scientists at The Master’s University, taking up a student research project is no small commitment.
Retired Professor Continues to Mentor Aspiring TMU Scientists
The Los Angeles County Department of Public Health is warning residents not to use a Vietnamese herbal ointment called “Cao Bôi Trĩ Cây Thầu Dầu” (Castor Oil Hemorrhoid Extract) because it contains lead and can be fatal.
Public Health Urges Residents to Avoid Vietnamese Hemorrhoid Cream
State Superintendent of Public Instruction Tony Thurmond hosted a California Apprenticeship Summit Wednesday to raise awareness of apprenticeship opportunities and career technical education pathways that connect California’s youth to high-wage, high-growth career opportunities.
State Apprenticeship Summit Connects Youth to High-Wage Opportunities
College of the Canyons student-athletes Nichole Muro (softball) and Angelo Aleman (baseball) have been named the COC Athletic Department's Women's and Men's Student-Athletes of the Week for the period running April 8-13.
COC Names Nichole Muro, Angelo Aleman Athletes of the Week
California State Sen. Scott Wilk, R-Santa Clarita, announced Wednesday his bill improving transparency between parents and schools’ sexual education curricula passed out of the Senate Education Committee.
Wilk’s Sex Education Transparency Bill Clears Senate Committee
1945 - Actors Harry & Olive Carey sell Saugus ranch after 29 years; now Tesoro del Valle [story]
Carey Ranch
The 76.6-mile-long Antelope Valley Line has the third-highest ridership in Metrolink’s system with an estimated average of 9,000 passengers daily. However, the uneven terrain and single-tracking along the line in some areas forces trains to travel at a slower speed which results in an estimated travel time of approximately one hour between Santa Clarita and Union Station.
Metrolink to Hold Public Meetings on AV Line Capacity, Improvements
Team Dragon Eyes, affectionately known as TDE, is gearing up to host its highly anticipated Fifth Annual Dragonboat Festival race on Saturday, June 1 at Castaic Lake, Lower Lagoon.
June 1: Team Dragon Eyes to Host Fifth Annual Dragonboat Festival Race
This year marks the 20th year that the city of Santa Clarita has been hosting the annual Bike to Work Challenge. The community is invited to celebrate by riding a bike to work the week of May 13, and stopping by a pit stop on Thursday, May 16.
Party at the Pit Stop, City Paves Way for 20th Annual Bike to Work Challenge
Ready to take control of your financial future? Join the Los Angeles County Department of Consumer and Business Affairs Center for Financial Empowerment for the next installment in the Lunch & Learn Financial Capability Month webinar series, "Understanding Credit.
Online Financial Workshops with County DCBA
The Santa Clarita Valley Concert Band will perform a "Starry Might" concert at 7 p.m. on Saturday May 4. The concert, under the direction of Tim Durand, will be held at the Canyon Theatre Guild, 24242 Main St., Newhall, CA 91321.
May 4: SCV Concert Band Presents ‘Starry Night’ at CTG
After a record-setting 2023 combatting organized retail crime, the California Highway Patrol continues to aggressively disrupt and dismantle illegal operations throughout California.
CHP Continues Organized Retail Crime Crackdown, Recovers $4.2M in Goods
Celebrate Earth Day on Monday, April 22 with California State Parks at any of the 280 unique park units across the state. State Parks has numerous Earth Day-themed events planned. They include in-person activities such as guided walks and hikes, workdays and a bioblitz, as well as virtual programming with a live dive broadcast exploring the hidden world of the ocean.
April 22: Celebrate Earth Day at California State Parks
1930 - Telephone switchboard operator Louise Gipe, heroine of the 1928 St. Francis Dam disaster, tries & fails to kill herself over an unrequited love [story]
Louise Gipe
Los Angeles County Sheriff Department’s Major Crimes Bureau Detectives worked closely with Century Station Detectives after learning of a serial robbery crew committing crimes throughout Los Angeles County. 
Serial Robbery Crew Arrested
Join the Samuel Dixon Family Health Center for their second annual Cornhole Tournament fundraiser where all proceeds will support mental health services to anyone in need.
May 18: Samuel Dixon Cornhole Tournament Fundraiser
California State University, Northridge will confer honorary doctorates on four alumni, all respected leaders in their fields, at the university’s commencement ceremonies next month.
CSUN to Confer Honorary Degrees on Business & Education Leaders, All Alumni
On Saturday, April 20, 2024 Valencia High School Theatre will host the 104th DTASC (Drama Teachers’ Association of Southern California) Shakespeare Festival.
April 20: 104th DTASC Shakespeare Festival at Valencia High School
SCVNews.com