[Sign Up Now] to Receive Our FREE Daily SCVTV-SCVNews Digest by E-Mail

Inside
Weather
Santa Clarita CA
Mostly sunny
Mostly sunny
92°F
 
Calendar
Today in
S.C.V. History
August 18
1946 - Pioneering Placerita Canyon movie producer Trem Carr dies in San Diego [story]


[Caltrans] – The California Department of Transportation plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports.

Closure Dates: Monday, October 29, to Saturday, November 3

 

Northbound I-5

* Northbound I-5 between Vista Del Lago Rd. and the Kern County line

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Quail Lake Road on-ramp to northbound I-5

TIME: 8 p.m. to 6 a.m.

* Northbound I-5 off-ramp to Quail Lake Road

TIME: 8 p.m. to 6 a.m.

 

Southbound I-5

* Southbound I-5 between the Kern County line and Vista Del Lago Rd.

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

 

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

Comment On This Story
COMMENT POLICY: We welcome comments from individuals and businesses. All comments are moderated. Comments are subject to rejection if they are vulgar, combative, or in poor taste.
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.

0 Comments

You can be the first one to leave a comment.

Leave a Comment


SCV NewsBreak
LOCAL NEWS HEADLINES
Friday, Aug 17, 2018
Big Oaks Lodge Fire an Accident, Arson Investigators Say
The fire that destroyed the historic Big Oaks Lodge on Bouquet Canyon Road in Saugus Aug. 11-12 was an accident, Sgt. John Hanson of the Los Angeles County Sheriff's Department's Arson & Explosives squad said Friday morning.
Friday, Aug 17, 2018
State Lawmakers Advance Bail Overhaul, Police Transparency Bills
Lawmakers advanced a controversial bill Thursday that aims to reform California’s money bail system though recent amendments have alarmed advocates who say the current bill could authorize prosecutors and judges to promote indefinite pretrial detention.
Friday, Aug 17, 2018
Caltrans to Repave 19 Miles of Sierra Highway in SCV
Nightly lane closures are scheduled to start Monday on Sierra Highway near Highway 14 as crews begin a paving project in and near the city of Santa Clarita, the California Department of Transportation announced Friday.
Keep Up With Our Facebook

Latest Additions to SCVNews.com
1946 - Pioneering Placerita Canyon movie producer Trem Carr dies in San Diego [story]
The JetHawks got some much-needed offense to beat Stockton, 9-7, Thursday night at The Hangar to end a five-game losing streak.
Offense Comes Through, JetHawks End 5-Game Skid
The Canyon Country Community Center’s next Sock Hop is scheduled for Saturday, Aug. 25, beginning at 7 p.m.
Aug. 25: Sock Hop at Canyon Country Community Center
Results of the first full year of Measure H funding are in, demonstrating widespread progress as services ramped up and thousands of individuals and families were housed temporarily or permanently, Los Angeles County officials said Friday.
Measure H First Year: Housing for 7,500, Help for Thousands More
The fire that destroyed the historic Big Oaks Lodge on Bouquet Canyon Road in Saugus Aug. 11-12 was an accident, Sgt. John Hanson of the Los Angeles County Sheriff's Department's Arson & Explosives squad said Friday morning.
Big Oaks Lodge Fire an Accident, Arson Investigators Say
Lawmakers advanced a controversial bill Thursday that aims to reform California’s money bail system though recent amendments have alarmed advocates who say the current bill could authorize prosecutors and judges to promote indefinite pretrial detention.
State Lawmakers Advance Bail Overhaul, Police Transparency Bills
Nightly lane closures are scheduled to start Monday on Sierra Highway near Highway 14 as crews begin a paving project in and near the city of Santa Clarita, the California Department of Transportation announced Friday.
Caltrans to Repave 19 Miles of Sierra Highway in SCV
The Western Association of Schools and Colleges' Senior College and University Commission has placed The Master's University & Seminary on probation after a visiting WSCUC team in March found TMUS out of compliance with numerous accreditation standards.
‘Climate of Fear,’ Admin Issues Lead to Probation for The Master’s University
Reversing a trial court and an appellate panel, the California Supreme Court ruled Thursday that asylum-seeking children with one parent living in the United States need only notify the foreign parent of their plans to seek resident status in the U.S.
California Justices Lift Custody Hurdle for Asylum-Seeking Kids
1920 - Actress Maureen O'Hara born in Ireland; 1961 "Parent Trap" uses Disney Golden Oak Ranch [story]
The County of Los Angeles Department of Parks and Recreation, in collaboration with The Friends of Hart Park, presents its, “7th Annual Summer Movies in the Park Series."
Aug. 17: Black Panther to Close Out Summer Movies in the Park Series
LANCASTER – The University of Antelope Valley (UAV) baseball program is pleased to announce the additions of 6-1 utility player Edmond Marcotte, 6-0 utility player Kyle Lathrop, and 6-1 pitcher Austin Grabbit, with all three players coming over to UAV from Antelope Valley College in Lancaster, Calif.
University of Antelope Valley Adds 3 New Players to Baseball Program
College of the Canyons is partnering with AMS Fulfillment to offer 30 pre-apprenticeships in the logistics field—one of the fastest growing industries in Los Angeles County—to individuals who need job readiness skills to gain employment.
COC Partners with Local Fulfillment Company to Offer Pre-Apprenticeships
Children and young adults need to be protected before heading back to school.
County Encourages Parents to Stay Current on School Immunizations
Well, I don't know but I've been told, you’ll never slow down, you’ll never grow old with the music of Tom Petty and the Heartbreakers.
Tom Petty & the Heartbreakers Tribute Band Free Falls into Concerts in the Park
Mayor Laurene Weste, Mayor Pro Tem Marsha McLean, Councilmembers Bob Kellar, Bill Miranda and Cameron Smyth cordially invite you to the 2018 State of the City Luncheon to be held on Thursday, Oct. 25, at 11:30 a.m., at the Hyatt Regency Valencia.
Oct. 25: “Santa Clarita – City of the Arts” State of the City Luncheon
To keep grass at parks green and lush despite constant use, the city of Santa Clarita Parks division works hard to maintain the high quality fields residents love.
City Aerates, Renovates Parks Ahead of Fall
The Saugus Union School District is very pleased to announce the awarding of two grants to provide arts education in the district.
County Arts Commission, Music Center Awarding Grants to Saugus Union
The New Heights Artist Development Series will be holding a free presentation on taxes and artists.
Aug. 23: New Heights Artist Development Series, “Taxes and the Artist”
After thirteen years of service, Saugus Union School District (SUSD) Governing Board Member Paul De La Cerda announced on Friday that he will not be seeking re-election.
Saugus School Board Member to Pursue Doctorate; Won’t Seek Re-Election
LANCASTER, Calif. – On the heels of their longest winning streak of the season, the Lancaster JetHawks are in the midst of their longest losing streak after a 6-4 defeat at the hands of Stockton Wednesday night at The Hangar. The loss was Lancaster’s fifth in a row.
Stockton Hands JetHawks 5th Straight Loss
Los Angeles County Sheriff’s Department’s Missing Persons Unit detectives are seeking the public’s assistance in locating Wayne Stuart Habell.
Detectives Seek Help in Locating Missing Fire Captain
LOS ANGELES – According to the South Coast Air Quality Management District, air quality will be unhealthy for sensitive individuals in Santa Clarita Valley tomorrow, Friday, Aug. 17.
Unhealthy Air Quality Declared in SCV Friday
1956 - Battle of Palmdale rages over the skies of Santa Clarita [story]
The Los Angeles County Board of Supervisors has selected Ricardo Garcia to be the county’s new Public Defender.
Supes Name Ricardo Garcia New LA County Public Defender
The seven Los Angeles County animal shelters including the Castaic Animal Care Center will offer $20 adoption fees for dogs and free adoption for cats on Saturday, August 18 from 10 a.m. to 6 p.m.
Aug. 18: Cheap, Free Pet Adoptions at Castaic Shelter
The U.S. Interior Department is against adding the Rim of the Valley Corridor to the Santa Monica Mountains National Recreation area, and it won't take a stand on the proposed St. Francis Dam Memorial legislation because it's an issue for the Agriculture Department, not the Interior Department.
Park Service Opposes Rim Addition, Defers on Dam Bill
Air quality will be unhealthy for sensitive people in the SCV on Thursday, according to an advisory from the South Coast Air Quality Management District.
Air Quality Unhealthy for SCV Residents Thursday
FOX Sports Prime Ticket, in partnership with the CIF Southern Section, will launch its TV-web coverage of the 2018 high school football season on Friday, Aug. 17.
Aug. 17: Friday Night High School Football Returns to Prime Ticket
The Lancaster JetHawks scored twice and put the tying run on base in the bottom of the ninth inning, but it was not enough in a 5-4 loss to the Stockton Ports Tuesday night at The Hangar.
Late JetHawks Rally Comes Up Short Against Ports
The Los Angeles Dodgers reinstated left-handed pitcher Alex Wood from the 10-day disabled list Thursday and placed right-handed pitcher John Axford on the 10-day disabled list with a fractured right fibula.
Dodgers Reinstate Pitcher Alex Wood
The Santa Clarita Valley Sheriff's Station has released its crime and public safety information report for Stevenson Ranch (Zone 3) for the week of Aug. 6-12, 2018.
Crime Blotter: Grand Theft, GTA in Stevenson Ranch
1849 - Eight-pound gold nugget found in San Feliciano Canyon (Val Verde/Piru area) [story]
Here is a list of Santa Clarita arts-related events for Aug. 15 - Aug. 17:
Aug. 15-17: Santa Clarita Arts Calendar
Walk season is quickly approaching, and it's time to turn up the heat in the fight to end Alzheimer's.
Walk to End Alzheimer’s Offers up New Challenge