Construction crews expect to have water main break cleanup work completed at Newhall Ranch and Bouquet Canyon by Friday evening, according to workers on the scene of a massive road repair Friday morning that caused significant traffic delays during the morning commute.
The water main break flooded the road Thursday evening, reducing traffic to one lane northbound on Bouquet Canyon Road and shutting down eastbound traffic on Newhall Ranch Road altogether.
The call came in at approximately 5:05 p.m. Thursday of a water main break, according to Fire Department Supervisor Art Marrujo.
![Newhall Ranch Road was underwater after a water main break Thursday evening. | Photo: Perry Smith/The Signal.](https://i0.wp.com/scvnews.com/wp-content/uploads/2019/08/signal-water-main-break-perry-smith-2-20190830.jpg?resize=556%2C741&ssl=1)
The roadway heading eastbound on Newhall Ranch Road from Bouquet Canyon Road had to be completely repaired from the intersection to about 100 yards east of it.
Northbound traffic on Bouquet Canyon Road was flowing again as of Friday morning.
Eastbound traffic at the intersection is expected to be moving again by 6 or 7 p.m. Friday, according to the earliest estimates from construction crews on the scene.
![Traffic is once again moving in the northbound lanes on Bouquet Canyon Road after a water main break. | Photo: Perry Smith/The Signal.](https://i0.wp.com/scvnews.com/wp-content/uploads/2019/08/signal-water-main-break-perry-smith-3-20190830.jpg?resize=556%2C417&ssl=1)
Traffic is once again moving in the northbound lanes on Bouquet Canyon Road after a water main break. | Photo: Perry Smith/The Signal.
Like this:
Like Loading...
Related
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.
0 Comments
You can be the first one to leave a comment.