header image

[Sign Up Now] to Receive Our FREE Daily SCVTV-SCVNews Digest by E-Mail

Inside
Weather


 
Calendar
Today in
S.C.V. History
May 6
1971 - Fort Tejon added to National Register of Historic Places [story]
Fort Tejon


[Caltrans] – The California Department of Transportation plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports.

 

Click image to enlarge

 

Closure Dates: Monday, October 22, to Saturday, October 27

 

Northbound I-5

* Northbound I-5 between Vista Del Lago Rd. and the Kern County line

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Quail Lake Road on-ramp to northbound I-5

TIME: 8 p.m. to 6 a.m.

* Northbound I-5 off-ramp to Quail Lake Road

TIME: 8 p.m. to 6 a.m.

 

Southbound I-5

* Southbound I-5 between the Kern County line and Vista Del Lago Road.

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Southbound I-5 off-ramp to Smokey Bear Road

TIME: 9 a.m. to 3 p.m. and 8 p.m. to 6 a.m.

 

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

Comment On This Story
COMMENT POLICY: We welcome comments from individuals and businesses. All comments are moderated. Comments are subject to rejection if they are vulgar, combative, or in poor taste.
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.

0 Comments

You can be the first one to leave a comment.

Leave a Comment


SCV NewsBreak
LOCAL NEWS HEADLINES
Sunday, May 5, 2024
Donohoe, Kurowski Named 2024 SCV Man, Woman of the Year
Dale Donohoe and Kim Kurowski were named the Santa Clarita Valley's top volunteers of the year at the 2024 SCV Man and Woman of the Year dinner celebration held Friday, May 3 at the Hyatt Regency Valencia. The event also honored all of the 17 men and 17 woman nominated for the award.
Friday, May 3, 2024
May 4: LACoFD Hosts Countywide Open House at All Fire Stations
Fire Service Day Open House will be held at all County of Los Angeles Fire Department fire stations on Saturday, May 4 from 10 a.m. to 5 p.m.
Friday, May 3, 2024
May 18: Support Young Creatives at NextGen MediaMakers Festival
The Santa Clarita Valley Media Collaborative invites the public as well as local creatives, media industry professionals, students, parents, teachers and others to celebrate the next generation of media makers participating in the inaugural NextGen MediaMakers Festival on Saturday, May 18 from 2-5 p.m. at the Canyon Country Community Center.
Keep Up With Our Facebook

Latest Additions to SCVNews.com
1971 - Fort Tejon added to National Register of Historic Places [story]
Fort Tejon
Dale Donohoe and Kim Kurowski were named the Santa Clarita Valley's top volunteers of the year at the 2024 SCV Man and Woman of the Year dinner celebration held Friday, May 3 at the Hyatt Regency Valencia. The event also honored all of the 17 men and 17 woman nominated for the award.
Donohoe, Kurowski Named 2024 SCV Man, Woman of the Year
1828 - Soledad Canyon settler John Lang born in Herkimer County, N.Y. [story]
Lang
1903 - President Teddy Roosevelt visits Gov. Henry Gage at Acton Hotel [story]
Acton Hotel
The regular meeting of the Saugus Union School District Governing Board will take place Tuesday, May 7, with closed session beginning at 5:30 p.m., followed immediately by public session at 6:30 p.m.
May 7: Regular Meeting of the Saugus School Board
The city of Santa Clarita Arts Commission is holding its regular meeting in City Hall's Council Chambers Thursday, May 9 at 6 p.m. The meeting will be held at Santa Clarita City Hall, 23920 Valencia Blvd., Valencia, CA 91355.
May 9: Arts Commission to Hear Updates on Civic Art Projects
Experience the Butterfly Encounter at Gilchrist Farm open now on weekends thorugh Sunday, June 18. Walk through a tent of beautiful flowers hosting live butterflies that fly freely throughout the tent.
Experience the Butterfly Encounter at Gilchrist Farm
The Santa Clarita Community College District Board of Trustees will hold a business meeting Wednesday, May 8, beginning at 5 p.m. The board will first meet in closed session at 4:15 p.m.
May 8: COC Board Business Meeting Considers Contracts
The Castaic Union School District Governing Board will hold its regular meeting Thursday, May 8, at 6 p.m. A closed session will be held at 5:30 p.m.
May 8: Castaic Union School Board Regular Meeting
Fire Service Day Open House will be held at all County of Los Angeles Fire Department fire stations on Saturday, May 4 from 10 a.m. to 5 p.m.
May 4: LACoFD Hosts Countywide Open House at All Fire Stations
The Santa Clarita Valley Media Collaborative invites the public as well as local creatives, media industry professionals, students, parents, teachers and others to celebrate the next generation of media makers participating in the inaugural NextGen MediaMakers Festival on Saturday, May 18 from 2-5 p.m. at the Canyon Country Community Center.
May 18: Support Young Creatives at NextGen MediaMakers Festival
Explore Vasquez Rocks during the magical twilight and early evening full moon hours. These fun, collaborative, interpretive hikes are led by trained staff and volunteers and will highlight the park's natural and human history.
Vasquez Rocks Full Moon Twilight Hikes
Astrotourism is top of mind for travelers making special trips for experiences in the sky, and with the recent “take-your-breath-away” total solar eclipse, thousands of cruisers onboard Emerald Princess and Discovery Princess off the coast of Mexico caught a glimpse of the total darkness event.
Princess Cruises Sails to Prime Viewing Spot for 2026 Total Solar Eclipse in Europe
The Santa Clarita City Council will hold a study session on Tuesday, May 7 at 5 p.m. The council will meet at City Hall, Carl Boyer Room, 23920 Valencia Blvd., First Floor, Santa Clarita, CA 91355.
May 7: City Council Conducts Budget Study Session
Garbage inspectors will soon be paying a visit to neighborshoods throughout the Santa Clarita Valley to inspect recycling bins to insure residents are following the recycling rules in the SCV.
Garbage Inspectors to Look for Improper Recycling
College of the Canyons competed at the 3C2A State Singles & Doubles Championships for a second straight year, with the doubles duo of Sydney Tamondong and Estrella Segura establishing program history by advancing to the round of 16 at the Ojai Athletic Club.
Canyons Advances to Day 3 of 3C2A State Championships
College of the Canyons men's basketball head coach Howard Fisher's Cougar Basketball Camp returns in 2024 with three sessions open to boys and girls ages 8 to 14.
Registration Open for 2024 Howard Fisher Cougar Basketball Camp
The Friends of Santa Clarita Public Library is hosting a “Spring Bag Sale” event at the Valencia, Canyon Country and Newhall branches of the Santa Clarita Public Library, during normal operating hours from Saturday, May 4 to Sunday, May 12.
May 4-12: Spring Bag Sale at Santa Clarita Public Library
A former public school teacher who launched a racist and anti-immigrant tirade against a Santa Clarita street vendor is being sued by a Latino civil rights group for civil assault and violating California civil rights laws.
MALDEF Sues Man After Rant at Fruit Vendor in SCV
The Village of Pine Mountain Club has hosted wine festivals since 2003. You can taste exciting wines from the world’s top wine-growing regions, with dozens of premier wineries to choose from on Saturday, July 6, 1-4 p.m. at Wine in the Pines.
July 6: Wine in the Pines, Pine Mountain Club
1842 - California's first mining district established in SCV; Ygnacio del Valle, chairman [story]
Ygnacio del Valle
The American Cancer Society Relay For Life of Santa Clarita Valley will be held Saturday, May 4, 9 a.m.-9 p.m. at Central Park, with the theme “May The Cure Be With You,” a Disney/Star Wars celebration.
May 4: SCV Relay for Life ‘May the Cure Be With You’
Ten risk-taking, mid-career artists were announced Thursday as the recipients of the 2024 Herb Alpert Award in the Arts (HAAIA).
CalArts Announces 2024 Herb Alpert Award Winners
CEDAR RAPIDS, Iowa -- The Master's University men's volleyball team won their opening match of the 2024 NAIA National Championship with a 3-set win over the No. 9-seed Mount Mercy (IA) Mustangs.
Mustangs Post-Season Play Continues After First Round Win
SCVNews.com