header image

[Sign Up Now] to Receive Our FREE Daily SCVTV-SCVNews Digest by E-Mail

Inside
Weather


 
Calendar
Today in
S.C.V. History
September 20
1954 - C-46 cargo plane crashes at Saugus Drunk Farm; Civil Air Patrol chaplains parachute to safety [story]
chaplains


[Caltrans] – The California Department of Transportation plans to close multiple lanes of the Golden State Freeway (I-5) in north Los Angeles County as part of a $100.1 million pavement improvement project between Vista Del Lago Road and the Kern County line.

Motorists should expect multiple simultaneous closures in different locations within the limits listed. Closures will be signed well in advance.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Closure information for this and other freeway projects is available on the Caltrans website: http://www.lcswebreports.dot.ca.gov/lcswebreports.

 

Click image to enlarge

 

Closure Dates: Monday, October 22, to Saturday, October 27

 

Northbound I-5

* Northbound I-5 between Vista Del Lago Rd. and the Kern County line

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Quail Lake Road on-ramp to northbound I-5

TIME: 8 p.m. to 6 a.m.

* Northbound I-5 off-ramp to Quail Lake Road

TIME: 8 p.m. to 6 a.m.

 

Southbound I-5

* Southbound I-5 between the Kern County line and Vista Del Lago Road.

One lane: One lane may be closed at any time.

Up to three lanes: 10 p.m. to 9 a.m. the following day

The most restrictive closures (i.e., the most lanes closed) will happen between 10 p.m. and 6 a.m. when traffic volumes are lower.

* Southbound I-5 off-ramp to Smokey Bear Road

TIME: 9 a.m. to 3 p.m. and 8 p.m. to 6 a.m.

 

About the Project

This project will replace slabs in both directions of I-5 between the Vista Del Lago Road overcrossing and the Kern County Line, a distance of 15.4 miles.

The two outside lanes and outside shoulder will be completely replaced, and damaged pavement slabs will be replaced in the inside lanes. Additionally, the project will update drainage features, upgrade the wooden guardrail posts to metal, add post mile signage, widen the inside shoulders, replace broken approach and departure slabs, and repave ramps.

This $100.1 million project, which will be completed in mid-2015, will extend the life of the pavement, reduce maintenance costs and closures, and provide a smoother ride for motorists. The contractor is Griffith/Coffman Joint Venture of Brea, Calif.

Most of the construction will be completed at night to minimize inconvenience to motorists, though there will be some work during the day.

Comment On This Story
COMMENT POLICY: We welcome comments from individuals and businesses. All comments are moderated. Comments are subject to rejection if they are vulgar, combative, or in poor taste.
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.

0 Comments

You can be the first one to leave a comment.

Leave a Comment


SCV NewsBreak
LOCAL NEWS HEADLINES
Friday, Sep 20, 2024
SUSD Committee Adjourns Meeting Due to Unruly Crowd
The meeting of the Saugus Union School District Asset Management Advisory Committee was adjourned after a large crowd reportedly became unruly during the public comment session.
Thursday, Sep 19, 2024
COC Receives $300,000 NASA Grant to Expand Student Access to STEM Fields
The College of the Canyons Aerospace and Science Team has received a $300,000 grant from NASA’s Mentoring and Opportunities in STEM with Academic Institutions for Community Success program.
Thursday, Sep 19, 2024
Sept. 26: Community Invited to David March Park Expansion Groundbreaking
One of the city of Santa Clarita community’s most cherished parks, David March Park is set to expand, Thursday, Sept. 26, at 10 a.m., 28310 North Via Joyce Drive, Santa Clarita, CA 91350 with a groundbreaking ceremony.
Keep Up With Our Facebook

Latest Additions to SCVNews.com
The meeting of the Saugus Union School District Asset Management Advisory Committee was adjourned after a large crowd reportedly became unruly during the public comment session.
SUSD Committee Adjourns Meeting Due to Unruly Crowd
1954 - C-46 cargo plane crashes at Saugus Drunk Farm; Civil Air Patrol chaplains parachute to safety [story]
chaplains
The College of the Canyons Aerospace and Science Team has received a $300,000 grant from NASA’s Mentoring and Opportunities in STEM with Academic Institutions for Community Success program.
COC Receives $300,000 NASA Grant to Expand Student Access to STEM Fields
Bring along a furry friend to the Santa Clarita Child & Family Center's Purple Walk Domestic Violence Awareness 5K on Saturday, Oct. 5 from 8-11 a.m. at the Center’s main facility 21545 Centre Pointe Parkway, Santa Clarita, CA 91350.
Oct. 5: 5K Purple Walk Dogs Against Domestic Violence
Written and directed by Braddon Mendelson, produced by Heather Mendelson, and co-produced by Olive Branch Theatricals and Noisivision Studios, "Provenance" will take stage at the The MAIN, 24266 Main Street, Santa Clarita, CA 91321, Friday through Sunday, Sept. 27-29.
Sept. 27-29: Braddon Mendelson to Present ‘Provenance’ at The MAIN
The Master's women's volleyball team opened Great Southwest Athletic Conference play on the road in Prescott, Ariz. on Wednesday, Sept. 18, defeating the Embry-Riddle Aeronautical University Eagles in straight sets 28-26, 25-22, 25-18.
TMU Women’s Volleyball Opens Conference Play with Road Win
College of the Canyons freshman Sahya Kitabatake shot a two-under-par round of 70 to tie for medalist honors while helping the Cougars place fourth at the Western State Conference tournament at Sterling Hills Golf Club in Camarillo on Monday, Sept. 16.
Kitabatake Medals, Canyons Women Take Fourth at Sterling Hills Golf Club
One of the city of Santa Clarita community’s most cherished parks, David March Park is set to expand, Thursday, Sept. 26, at 10 a.m., 28310 North Via Joyce Drive, Santa Clarita, CA 91350 with a groundbreaking ceremony.
Sept. 26: Community Invited to David March Park Expansion Groundbreaking
SRD Straightening Reigns, a therapeutic organization offering equine assisted psychotherapy, has been awarded $278,870 from the California State budget to improve mental health services.
California Awards $278,870 in Funding to SRD Straightening Reins
The Santa Clarita Community College District Board of Trustees appointed Carlos Guerrero to fill the board seat in Area 5, effective immediately, at its special Wednesday, Sept. 18 meeting.
COC Board of Trustees Appoints Carlos Guerrero to Area 5 Seat
California Institute of the Arts alums Alyssa Dressman Lehner and Clara Plestis captured Emmy Awards at the 76th Primetime Creative Arts Emmy Awards.
Two Calartians Win 2024 Creative Arts Emmy Awards
Valencia High School's Choir will hold a fall concert, "Broadway, Movies & Media" at 7 p.m., Thursday, Sept. 26 at 7 p.m. and Friday, Sept. 27, 7 p.m. at the Saugus High School Theatre, 21900 Centurion Way, Santa Clarita, CA 91350.
Sept. 26-27: Valencia High Choir Presents Fall Concert ‘Broadway, Movies & Media’
As my wife, Virginia, and I stroll through our magnificent city, we admire the beautiful paseos and the expansive open spaces, but what really catches our eye, is the diverse works of art at every turn.
Bill Miranda | Santa Clarita Arts, a Journey Through Creativity
The California Department of Public Health is encouraging all Californians to get vaccinated this season to protect themselves and loved ones from respiratory viruses.
CDPH: Stay Up to Date on Vaccines
The Friends of Santa Clarita Public Library in collaboration with Santa Clarita Valley Libraries will have a silent Book Auction beginning at 9 a.m. Monday, Sept. 30, through 10 a.m. on Monday, Oct. 7.
Sept. 30: Public Libraries to Host Silent Book Auctions
1863 - Gen. Edward F. Beale loans money to A.A. Hudson and Oliver P. Robbins to erect toll house in Newhall Pass [story]
toll house
The Counties of Los Angeles and San Bernardino today announced the opening of multiple joint Local Assistance Centers to assist residents impacted by the Bridge and Line Fires.
Joint Assistance Centers Open for Residents Impacted by Bridge, Line Fires
Valencia Gynecology Associates, owned by longtime Santa Clarita Valley OB-GYN physician Don Nishiguchi, MD, has joined the Henry Mayo Newhall Hospital network. 
Valencia Gynecology Assoc. Joins Henry Mayo Network
JCI Santa Clarita is proud to announce the upcoming Veteran’s Resource Fair, scheduled to take place on Sept. 21 at William S. Hart Park. 
Sept. 21: JCI Invites All Veterans to Upcoming Resource Fair
A "friendies" field tournament  is being  hosted by the Saugus Instrumental Music program, with support from Valencia High, later this month. 
Sept. 21: All Valley Showcase Comes to Valencia High
Public, member-supported 88.5 FM The SoCal Sound, Southern California’s leading Triple-A (adult album alternative) format radio station has announced the lineup for its inaugural “Year-End Bash” taking place on Saturday, Dec. 7.
Dec. 7: CSUN Owned 88.5-FM The SoCal Sound Announces “Year End Bash” Lineup featuring Ben Gibbard
The Master's University cross-country teams continued their successful 2024 campaigns with strong finishes at the BIOLA Invitational on Friday, Sept. 13 at Craig Regional Park in Fullerton, Calif.
TMU Women Win, Men Place Second at XC Invitational
Sheriff’s Department Announces New Law Enforcement Gang Policy
LASD Announces New Policy on Law Enforcement Gangs
The biology department at California State University, Northridge has stayed committed to promoting STEM research carried out by K-12 students and teachers in the Los Angeles Unified School District.
CSUN Student Research Journal Celebrates 28 Years of Inspiring Scientific Imagination
SCVNews.com