header image

[Sign Up Now] to Receive Our FREE Daily SCVTV-SCVNews Digest by E-Mail

Inside
Weather


 
Calendar
Today in
S.C.V. History
April 27
1971 - Tejon Ranch Co. allows Fire Dept. to torch the historic Hotel Lebec [story]
Lebec Hotel fire


AIM-9x missile fired from an F/A-18C

The Pentagon is ordering more missiles from Raytheon, and that means more work – and more Defense Department dollars – are coming home to Valencia.

The Navy announced Thursday it has awarded a $69 million modification to a Raytheon missile contract. Raytheon is in Tucson, but 5.71 percent of the work, valued at $3.93 million, will be subcontracted out to a pair of Valencia companies.

Woodward HRT (formerly Hydraulic Research-Textron) builds the sophisticated tail fins for Raytheon’s AIM-9x missile, and specialty electronics manufacturer Cicoil LLC supplies a cable assembly. Both are located in the Valencia Industrial Center and both get a piece of the new contract, a Raytheon spokesman said in September when the original $62 million contract was announced.

At that time, only half as much work – 2.81 percent, or $1.75 million – was to be performed in Valencia.

The original contract with Raytheon called for 60 AIM-9x tactical missiles (30 for the Navy and 30 for the Air Force) and 60 captive air training missiles (20 for the Navy and 40 for the Air Force), along with 60 active optical target detectors (30 Navy, 30 Air Force) and 34 containers (14 Navy, 20 Air Force).

Raytheon's AIM-9x air-to-air missile in flight

The modified contract increases the number of tactical missiles and optical target detectors to 115 each (66 Air Force, 49 Navy), among other change orders.

The AIM-9x is a short-range, air-to-air combat missile, similar to a Sidewinder but with an improved sighting cone, smaller fins for reduced drag, and added maneuverability in Woodward HRT’s tail fins.

The contracting agency is the Naval Air Systems Command in Patuxent River, Md. The contract combines purchased for the Air Force ($36 million, or 52.34 percent) and Navy ($33 million, 47.66 percent).

Comment On This Story
COMMENT POLICY: We welcome comments from individuals and businesses. All comments are moderated. Comments are subject to rejection if they are vulgar, combative, or in poor taste.
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.

No Comments

    Leave a Comment


    Latest Additions to SCVNews.com
    1971 - Tejon Ranch Co. allows Fire Dept. to torch the historic Hotel Lebec [story]
    Lebec Hotel fire
    In the Roaring ’20s in the big city, if there’s enough “razzle dazzle,” you just might get away with murder. That’s the premise of the hit musical “Chicago,” which has enjoyed success for nearly 50 years, and was based on true-crime stories of a century ago.
    May 2-4: ‘Chicago’ On Stage at West Ranch High School
    California Institute of the Arts will present the annual CalArts Expo on Saturday, May 2. The Expo is an institute-wide event featuring interdisciplinary creative work from the CalArts community, ranging from current students to internationally renowned faculty and alumni creators.
    May 2: Annual Cal Arts Expo Open to the Public
    Blue Heat, the Saugus High School show choir team, ended its competition season on April 12 with a first-place finish in the mixed division Tier IV at John Burroughs Music Showcase 2024 held in Burbank. The team also won the awards for Best Musicianship and Best Showmanship.
    Saugus High Show Choir Captures Awards at Music Showcase
    Against a backdrop of cinematic magic at Nickelodeon Animation Studios in Burbank, California Institute of the Arts honored the transformative power that philanthropy has had in nurturing the dreams of CalArts students.
    CalArts Honors Scholarship Donors at Nickelodeon Event
    Two classic one-act comedies written by the late James McLure are coming to The Main in Old Town Newhall for a two-weekend run starting Friday, May 10.
    May 10: Two Classic One Act Comedies Open at The Main
    The Los Angeles County Department of Economic Opportunity and the County Film Office, in partnership with Los Angeles County Board of Supervisor Chair Lindsey P. Horvath and Fifth District Supervisor Kathryn Barger, unveiled a new $4.1 million grant program to provide relief to small and micro businesses affected by both COVID-19 and the 2023 Hollywood double strikes.
    $4.1 Million Grant Program for Small, Micro Businesses in L.A. County
    Join the Saugus Instrumental Music Program at Saugus High School for a fun community event. Get ready, Santa Clarita, for an unforgettable morning of shopping, entertainment and support. The Saugus Instrumental Music Program Rummage Sale, where treasures abound and bargains await will be held Saturday, June 8, 7 a.m. to 1 p.m.
    June 8: Saugus High Instrumental Music Program Rummage Sale
    The Placerita Canyon Nature Center Associates invite residents of the Santa Clarita Valley to the annual Placerita Canyon Nature Center Open House event to be held Saturday, May 11, 10 a.m. to 2 p.m.
    May 11: Placerita Canyon Nature Center Open House
    1906 - Bobby Batugo, World Champion Mixologist in the 1970s, born in The Philippines [story]
    Bobby Batugo
    Starting Monday, April 29, construction on the South Fork Trail will begin to replace a portion of the lodgepole fencing, the city of Santa Clarita announced.
    South Fork Trail Construction to Begin April 29
    College of the Canyons dual-sport athlete Sam Regez will continue his career at University of Portland with plans to run on both the cross country and track and field programs.
    COC Standout Sam Regez Signs with University of Portland
    An entertainment industry initiative to support the voices of California State University, Northridge film and TV students was celebrated with a recent screening of stories they created. 
    ‘Changing Lenses’ Initiative Lends Voice to CSUN Film, TV Students
    How important is Film and Tourism to the Santa Clarita Valley Economy? 
    SCVEDC Delves into Santa Clarita Film, Tourism Impact
    Earlier this month, a team of biology students at The Master’s University won a distinguished award at one of the oldest intercollegiate research conferences in the country.
    TMU Biology Students Earn Recognition at Annual Research Conference
    Lisa Zamroz has announced her intent to step down as the head coach of The Master's University's women's basketball team effective July 1, 2024.
    TMU Women’s Basketball Coach to Resign
    Spring heralds a time of renewal and rejuvenation, not just in the natural world, but within our homes and lives as well.
    Cameron Smyth | Spring Cleaning Your Neighborhood
    College of the Canyons student-athletes Gigi Garcia (softball) and Hannes Yngve (men's golf) have been named the COC Athletic Department's Women's and Men's Student-Athletes of the Week for the period running April 15-20.
    COC Names Gigi Garcia, Hannes Yngve Athletes of the Week
    California Institute of the Arts' Community Weekend kicks off on Friday, April 26 and runs through Sunday, April 28.
    April 26-28: Community Weekend Returns to CalArts
    May is National Foster Parent Appreciation Month! Celebrate by applying to become a resource parent and fostering or foster-adopting siblings.
    May 16: Children’s Bureau Foster Care Orientation
    Santa Clarita resident Edina Lemus has been appointed Administrator of the Veterans Home of California in Lancaster by California Gov. Gavin Newsom.
    Newsom Appoints SCV Resident Veterans Home Administrator
    The California Department of Transportation has scheduled Lane Closures on the northbound and southbound State Route 14 between Technology Drive in Palmdale and Avenue A in Lancaster, closing up to three lanes.
    Caltrans Announces SR-14 Lane Closures
    1906 - Bercaw General Store opens in Surrey (Saugus) [story]
    Bercaw Store
    State Superintendent of Public Instruction Tony Thurmond testified today in the Senate Education Committee about the need for results-proven training for all teachers of reading and math.
    State Superintendent Makes Historic Push for Results-Proven Training in Literacy, Math as Sponsor of SB 1115
    SCVNews.com