To accommodate the Golden Valley Road Bridge widening project, State Route 14 in both directions at the Golden Valley Road Bridge will be subject to nightly closures from Tuesday, Sept. 8, through Friday morning, Sept. 11. Additional nightly closures for the construction will resume on Tuesday, Sept. 15, through Thursday morning, Sept. 17.
During the construction, the northbound State Route 14 will be subject to closures from midnight to 6 a.m. and the southbound State Route 14 will be subject to closures from 11 p.m. to 4 a.m. from Sept. 8-11, and Sept. 15-17. Both directions of the State Route 14 will never be closed at the same time.
State Route 14 traffic will be detoured utilizing respective State Route 14 off-ramps and on-ramps in each direction. Motorists who travel during the early hours through this area are advised to plan on slightly heavier traffic.
The Golden Valley Road Bridge widening project will add an additional two lanes of travel, one in each direction, for a total of four through lanes on the bridge, as well as a dedicated left turn lane to access the southbound State Route 14 and two left turn lanes to access the northbound State Route 14. This project will also add a pedestrian walkway on the north side of the bridge and a bike path on the south side of the bridge.
To watch the expansion of the Golden Valley Road Bridge online, check out the live Construction Cam on the City’s website.
For additional information on the Golden Valley Road Bridge widening project, including traffic schedules and detours, please contact Project Manager Harry Corder at 661-290-2290 or gvr@santa-clarita.com.
Like this:
Like Loading...
Related
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.
3 Comments
Debra L Noe
Joey Campbell may have trouble getting home if its closed
Justin Lundin Daniel D Lundin