The California Department of Transportation announced northbound overnight lane reductions on Interstate 5 from Lake Hughes Road to two miles north of Templin Highway, near the Whitaker Sand Shed, north of Castaic overnights Tuesday, Oct. 15 through Thursday, Oct. 17 to reconstruct a box culvert.
Lane closures are subject to change and are scheduled as follows:
Tuesday, Oct. 15 through Thursday, Oct. 17:
–Northbound I-5 will be reduced to two lanes from 8 p.m. to 11:59 p.m. and then it will be reduced to one lane until 6 a.m.
–Lanes will reopen each morning.
–The northbound right lane remains closed 24/7 into November. Paving on the southbound lanes is complete and all southbound lanes will remain open overnights.
This construction is part of a project that began in April of 2022. The overall scope of the project includes replacing concrete slabs, upgrading drainage systems and guardrail, repairing and stabilizing slopes through rock scaling and installing geogrid and construction of the retaining wall.
Please allow extra travel time and drive with caution through the construction zone as work continues to keep the freeways safe.
Watch for updates at Caltrans (District 7) on X.
Watch for closures and traffic conditions at Caltrans QuickMap.
Like this:
Like Loading...
Related
REAL NAMES ONLY: All posters must use their real individual or business name. This applies equally to Twitter account holders who use a nickname.
0 Comments
You can be the first one to leave a comment.